Engineering Performance
The company has 18 years of mold flux production history, and has long served Shougang Group, Shandong Iron and Steel Group, Nangang Group, Yongfeng Group, etc., and is applied to slabs, square billets, round billets and other billets. Applicable to conventional casting speed and high speed casting machine, with stable product quality, advanced production technology and senior expert team.
Overall Contracting Performance Of Tundish Lining
- Categories:Engineering Performance
- Time of issue:2021-11-02 23:44:03
- Views:0
Tundish lining, three-piece overall contract performance table< /p>
single bit |
cast machine |
Medium size |
Contract content |
Contract Time |
Refractory Availability |
|
Nanjing Iron & Steel Co. |
Three Steelmaking (Electric Furnace Plant) |
1# machine billet |
30 tons |
Tundish repair and overall contracting |
September 2008 to present |
Permanent layer, coating material, impingement plate, slag retaining wall |
2# machine bloom |
35 tons |
Tundish repair and overall contracting |
June 2008 to present |
Permanent layer, dry material, impact plate, slag retaining wall |
||
Steelworks (Old Plant) |
2# machine slab |
30 tons |
Tundish repair and overall contracting |
January 2011 to December 2012 |
Insulation layer, permanent layer, dry material, impact plate, slag retaining wall |
|
3# machine billet |
35 tons |
Tundish repair and overall contracting |
January 2008 to December 2013 |
Insulation layer, permanent layer, dry material, impact plate, slag retaining wall |
||
4# machine billet |
30 tons |
Tundish repair and overall contracting |
January 2008 to December 2010 |
Insulation layer, permanent layer, dry material, impact plate, slag retaining wall |
||
Second steelmaking (new steelmaking plant) |
3# machine billet |
40 tons |
Tundish repair and overall contracting |
January 2014 to present |
Construction and maintenance of insulation layer, permanent layer, dry material, impact plate, slag retaining wall 1~3# machine cover steel structure and castable construction and maintenance of ladle cover steel structure and castable |
|
Jiangyin Xingcheng Special Steel Co., Ltd. |
A steelmaking |
Billette |
38 tons |
Tundish repair and masonry overall contract (including stopper installation) |
January 2008 to present |
Construction and maintenance of permanent layer, spray paint, smear, impact plate, seat brick, middle cover castable |
Second steelmaking |
Billette |
38 tons |
Tundish repair and masonry overall contract (including stopper installation) |
January 2016 to present |
Construction and maintenance of permanent layer, smear, impact plate, block castable in the middle and cover |
|
Special board factory |
Slab |
38 tons |
Tundish repair and masonry overall contract (including stopper installation) |
March 2009 to present |
Construction and maintenance of permanent layer, dry material, smear material, impact plate, seat brick, middle cover castable |
|
Bloom billet, round billet |
50 tons |
Tundish repair and masonry overall contract (including stopper installation) |
March 2010 to present |
Construction and maintenance of permanent layer, dry material, smear material, impact plate, seat brick, middle cover castable |
||
Shougang Jingtang Iron & Steel Co., Ltd. |
Wide and thick slabs |
80 tons |
Tundish repair and overall contracting |
September 2009~June 2012 |
Insulation layer, permanent layer, dry material, slag retaining wall, double-effect impact brick, etc. |
|
Wide and thick slabs |
80 tons |
Tundish repair and overall contracting of three major parts (including stopper installation and mechanism maintenance) |
July 2012~December 2015 |
Insulation layer, permanent layer, dry material, slag retaining wall, double-effect impact brick, seat brick, quick-change water inlet and outlet, quick-change mechanism, middle bag water outlet, large bag long nozzle, stopper rod, immersion nozzle Construction and maintenance of steel structure and castables in the middle cladding |
||
Wide and thick slabs |
80 tons |
Overall contract for tundish repair (including maintenance of stopper rod installation mechanism) |
January 2016 to present |
Insulation layer, permanent layer, dry material, slag retaining wall, double-effect impact brick, etc. Construction and maintenance of steel structure and castables for tundish cover Construction and maintenance of castables for ladle cover |
||
How can I help you?
Tel:0086-533-4688338 / 0086-533-4688800
E-mail:guomaoyj@yeah.net
Add:Industrial Park, Baita Town, Boshan, Zibo, Shandong
Copyright © 2021 Shandong Guomao Metallurgical Materials Co., Ltd. All rights reserved 鲁ICP备2021035713号-1 国际站建设:中企动力 淄博 外贸谷歌推广